Lamar Utilities Board meeting of October 27, 2026

Minutes from the October 13, 2026 meeting were approved unanimously, as well as Purchase Orders 2025-07578 through 2025-07875.  The purchase orders totaled $64,585.76.  The largest was for $17,048.00 to IMA Financial Group for gas pipeline insurance renewal.  Another large amount was $11,013.12 to Sensus for a transceiver.  Ronnie Farmer, CPA, presented the 2025 Audited Financial Statement to the board.

Next, the board approved write-offs for 2026.  The uncollectable amounts recommended to be written off for 2025 were a total of $21,065.22, which represents .14% of the 2025 electric sales revenue of $15,387.175.  The budget for write-offs is $40,000.  These accounts were turned over to a collection agency, but have not yet been collected.

The August 2026 Financial Report was also presented to the board.  These include the balance sheet, income statement, YTD income statement, and YTD comparisons with last year.  The Balance Sheet showed no significant changes. Cash is up $478,938 from July and accounts receivable increased by $95,891.  The Income Statement showed that total operating revenue for the month is $1,819,565 and operating costs were $1,229,696 resulting in gross operating income of $589,869.  When the non-operating revenues and expenses are taken into consideration there is a net income for the of $543,653.  The YTD Income Statement showed total operating revenues for the year of $10,095,307 and total operating costs are $8 ,367,449 resulting in gross operating income of $1,727,859.  When the non-operating revenues and expenses are taken into consideration there is a net income of $429,344 year to date.  YTD Comparison with last year shows that revenues from retail sales are down approximately $402,334 or 4% comparing August 2026 to August 2025 and overall operating expenses are up approximately $27,295 or less than 1%, resulting in a net income of $429,344 for the year.

Superintendent Hourieh’s System Operating Report states that through the end of September, our wind turbines have generated 7,762.70 MWH’s of electricity.  This is about 23.85% higher than the same period in 2025.  The turbines have an average capacity factory 28.20% which is also higher than last year by about 1.06%.  When compared individually, T-3 ranked first, followed by T-1.  ARPA’s turbine, T-4 generated 3,327.80 MWH’s.  The Springfield turbine generated 4,505.63 MWH’s  through the same period with average capacity factory of 45.92%.  Our wind turbine crew completed the annual maintenance program on all 5 turbines per GE’s guidelines.  With CCE Engineering on site, we completed the needed repairs to LAMSO substation L-1 breaker high voltage bushing.  We also performed breaker maintenance on L2, L3, and L25 substation breakers.  With Substation Power Servbice on site, we completed torquing LAMSO’s main 40MVA power transformer bolts per industry standards.  All work was performed without an power outages to our customers.  The entire substation was de-energized and the load switched to the plant side while work was being performed.

The next meeting of the Lamar Utilities Board will be Tuesday, November 9, 2026 at noon.